Object 01
Station darkEnergised
Project
Ekiti Independent Power
Scope
Generation plant and distribution network
Capacity
5MW
Status
Completed

20+

Years of Engineering Excellence

8MW

Largest Single-Plant Generation Delivered

7

Flagship Power Projects Executed

30+

Certified Engineers & Technicians

The Lobcom project team outside the Ekiti power station
Medium-voltage switchgear panels installed by Lobcom

20+

Years of Engineering Excellence

Who we are

Two decades of engineering excellence

LOBCOM ASSOCIATES was established in 2002 and incorporated as LOBCOM ASSOCIATES ENGINEERING LTD in 2017, a member of the Lobcom Group Incorporation, is a full-solution MEP consulting, contracting and facility management engineering practice.

  • COREN-registered professional engineers
  • Projects delivered start to successful completion
  • Investigative engineering for insurance & legal

The Lobcom Way

We design, build, modify and enhance the business environment.

We maintain and protect it across power, mechanical, electrical and plumbing disciplines.

And we investigate it when it fails. Engineering it until it doesn't.

Power. Precision. Progress.

Selected work

The portfolio, on the line

Drawn as a single-line diagram. Scroll drives current down the bus; each project's breaker closes as it arrives.

Connected capacity0/19MW

Sites energised0/4

  1. Uraga Power (Honeywell Group) logo
    08

    Power Generation

    Uraga Power (Honeywell Group)

    8MW Generation — Sagamu

    Scope
    Honeywell Group (Uraga Power Solutions) 8MW power generation plant, Sagamu.
    Capacity
    8MW
    Location
    Sagamu, Ogun State
    Status
    Completed
  2. Ekiti IPP Limited: 5MW Ekiti Independent Power01

    Power Generation

    Ekiti IPP Limited

    5MW Ekiti Independent Power

    Scope
    Independent power plant and distribution network — electrical installation engineer and distribution network contractor.
    Capacity
    5MW
    Location
    Ekiti State
    Status
    Completed
  3. Uraga Power (Honeywell Group) logo
    06

    Power Generation

    Uraga Power (Honeywell Group)

    6MW Generation — Apapa

    Scope
    Honeywell Group (Uraga Power Solutions) 6MW power generation plant, Apapa.
    Capacity
    6MW
    Location
    Apapa, Lagos
    Status
    Completed
  4. HBM: Gas Compression Station — Calabar02

    Oil & Gas

    HBM

    Gas Compression Station — Calabar

    Scope
    Recently commissioned gas compression station for HBM in Calabar, Cross River State.
    Location
    Calabar, Cross River State
    Status
    Completed
Insights

From our engineers

Sourced, practical guides on power, metering, regulation and the cost of running a Nigerian facility.

content-engine

60 min read

Fire Protection and Firefighting Systems: Design, Testing and Compliance

Commercial fire protection depends on coordinated passive barriers, alarms, suppression systems, fire-water infrastructure and emergency-response interfaces. The article explains how to establish an AHJ-reviewed design basis, avoid incomplete scopes and select systems from the building's documented hazards.

Read article
content-engine

56 min read

16 States Now Own Their Electricity. Is Yours One of Them, and Why Should You Care?

State electricity markets regulate qualifying electricity activity conducted wholly within a state; they do not automatically transfer asset ownership or create an operating licence regime. Learn how to verify transfer orders, test intrastate boundaries and assess the full cost of electricity supply.

Read article
content-engine

63 min read

Hospital MEP Checklist: Medical Gas, Nurse Call, Isolated Power, HVAC

A practical reference for coordinating, budgeting and procuring medical gas, nurse call, isolated power and clinical HVAC in Nigerian hospitals. It focuses on clinical interfaces, maintainability, testing evidence and risk-based delivery priorities.

Read article

Ready to build?

Let's design, build and protect your environment.

We design, build, modify, enhance, maintain and protect the business environment.